VisualGate
$129.00
Noise Gate, one of the three main plug-ins of digital mixing, is the perfect TONE SHAPING tool. It is included for AU, VST3. AAX (for Pro Tools) is currently waiting for approval. We will update you as soon as it is approved.
한국내에서의 구매는 왼쪽에서 KRW를 선택하시면 한국가격이 나옵니다. 결제를 진행하시면 Paypal이 아닌 국내 결제 서비스를 사용하실 수 있습니다.
License Information
VisualGate
VisualGate
Full License
Up to 3 devices
Lifetime
$99.00
✓ Compatible with all major DAWs
✓ Free updates and support
✓ Centralized license management at bluesonolab.com
✓ 3 device activations per license
Description

Core Features
Revolutionary features for professional audio processing
Visual Feedback
Real-time waveform analysis with intuitive visual interface for precise gating control.
Precision Control
14 professional-grade knobs for fine-tuning every parameter with intuitive and accurate operation.
Ultra-Low Latency
Sample-accurate processing minimizes delay time, optimized for real-time recording and live performance.
Sidechain Input
Advanced gating techniques using external signals for creative rhythmic patterns and unique sound design.
Preset Library
Professional presets for various genres and applications, enabling quick workflow and creative inspiration.
Beautiful Interface
Modern, intuitive design maximizes workflow efficiency with clean layout showing all functions at a glance.
6 Languages Supported
Multi-language interface for producers worldwide
Advanced Processing Features
Revolutionary DSP Technology for Professional Audio Production
🎯 Advanced Parameters
Complete Control with 14 Precision Knobs
Complete control over every aspect of the gate with 14 precision knobs. Each parameter is designed for professional mixing workflows with intuitive visual feedback.
- Detection: 5 specialized modes (1 Sample, 40 Sample, 5ms, 10ms, 30ms)
- Threshold & Range: Gate trigger level and depth control
- Attack & Release: Gate opening and closing speed adjustment
- Hold & Hysteresis: Minimum open time and chatter prevention
👁️ Visualized Precision Control
Real-Time Visual Feedback
See exactly what your gate is doing with real-time waveform visualization and intuitive visual interface.
- Real-time Waveform Display: Visual representation of input signal
- Gate Status Indicator: Clear display of gate open/close state
- Envelope Tracking: Real-time tracking of Attack, Hold, Release phases
🎚️ A-Gain (Active Gain)
Intelligent Gain Compensation System
A-Gain automatically compensates for level changes during gate operation, providing innovative functionality.
- Automatic Level Matching: Auto-match volume before and after gate application
- Consistent Mix Balance: Maintain mix balance even when changing gate settings
- Workflow Enhancement: Focus on gate parameters without level adjustments
📈 S-Curve Response
Natural Gate Response Curve
S-Curve makes gate opening/closing response smooth and musical, providing advanced functionality.
- Natural Fade: Smooth transitions instead of abrupt gate operation
- Musical Expression: Preserve natural dynamics of vocals and instruments
- Artifact Removal: Clean gating without clicks or pop noise
🎨 MINI Mode
Resource Optimization and Efficient Workflow
MINI mode provides only essential functions to minimize CPU usage and enable fast workflow.
- Resource Optimization: Significantly reduced CPU usage
- Essential Visual Aid Only: Focus on core parameters and visual feedback
- Screen Space Saving: Efficient use even on small screens
Technical Specifications
Premium specifications for professional-grade performance
Supported Formats
VST3, AU, AAX
Sample Rate
44.1kHz – 192kHz
Bit Depth
64-bit floating point
Latency
< 1ms (sample accurate)
CPU Usage
Very low (optimized)
Compatibility
All major DAWs
Download Now
Available for Windows and macOS
System Requirements: Windows 10+ or macOS 10.12+
VST3, AU, AAX host application required
Real-World Applications
Proven performance in professional studios
Drum Processing
Enhance punch of kick and snare while removing unwanted bleed. Create tight and clean drum sounds.
Vocal Cleaning
Naturally remove breath noise and background noise while maintaining vocal expressiveness.
Guitar Gating
Remove amp noise and enhance riff attack for more impactful guitar sounds.














Reviews
There are no reviews yet.